| Walkways and Patios |
| We start by excavating 8-10 inches (depending on soil content). We then install crusher run and compact in 3 inch increments. Stonedust is then installed as top layer of underlay and compacted. The pavers, brick and stones are then installed. Steel or plastic edging may then be installed on sides of walkway depending on the individual application. |
| Stone Walls |
| We start by excavating 4-6 inches. We then install and compact gravel as base for wall. |